Project Features
Contractor: Firat Tahin and Sesame Industry LTD. STI.
District: Beştepe
Project Start Date: 17.09.2018
Project Completion Date: 15.03.2019
Total Construction Area: 75.694 m2
Land Area: 96.220 m2
Technical details
The Museum and Car Park structure consists of 3 main floors and 1 mezzanine in total. The 2nd basement and 1st basement floors are car park floors, and 801 car parking lots have been calculated in these areas and the works have been designed. The 2nd basement floor area is 16,135 m2, and the 1st basement floor area is 15,552 m2.
In Landscape Applications
548 coniferous trees, 943 deciduous trees, 4730 shrub-like landscape elements, 1060 perennial flower-type landscape elements, 1674 ivy-type landscape elements, 50 spherical potted tree-class landscape elements and 28.000 m2 ready culture grass will be used. .
Location | Yenimahalle / ANKARA |
---|---|
Starting date | 15.07.2018 |
End Date | 17.07.2019 |